Goshen News, Goshen, IN

Local News

February 10, 2013

City officials favor a ‘northern connector’ for re-route of U.S. 33 through Goshen

GOSHEN — A plan to reroute U.S. 33 through Goshen is gaining favor with state highway officials and, if implemented, would change the way traffic flows through and around the city.

The “north connector route” has been endorsed by the Goshen Chamber of Commerce and the Goshen City Council. Now it is up to the officials at the Indiana Department of Transportation to approve the route. According to city engineer Mary Cripe, that approval is getting closer.

“This is one of two options they are looking at,” Cripe said while reviewing a map of the proposed route in her office Monday.

The other option is the long-shelved plan to widen U.S. 33 (Madison Street) with an underpass at the Ninth Street railroad tracks and the closing of Eighth Street.

Cripe said she expects INDOT officials will make a final decision on the route this year. Property acquisition could begin in 2014 with construction getting under way in 2016, according to Cripe.

In years past, INDOT had proposed widening U.S. 33 to four and five lanes from C.R. 40 northwest all the way to Main Street. The widening of Madison is opposed by some Goshen residents who want to preserve a historic home at Fifth and Madison, and the First English Lutheran Church across the street. Nor do they want a four-lane road to bisect the Historic Southside Neighborhood-downtown link. There have also been concerns voiced about how a widened U.S. 33 (Madison Street) would impact the safety of children walking to and from Chandler Elementary School, which is located at Eighth and Madison streets.

Since the City Council and Chamber endorsed the north connector route, that plan has gained traction. Cripe said she feels INDOT officials are now favoring that route, but nothing is certain at this point.

So far Cripe has been the public voice of the project, despite U.S. 33 being under the control of INDOT.

“It’s not really a city project,” Cripe said, “but it is impacting us and the residents, so it is our business.”

The north route

Cripe said INDOT has about $35 million to spend on the Goshen project and the north connector route would cost $5 million to $7 million more than the Madison Street route. That means there is not enough money available to reconstruct U.S. 33 from C.R. 40 to Main Street. Instead, the north connector route would begin at Monroe Street, swing north through the right field of Goshen High School’s Phend Field baseball diamond and then parallel the Norfolk Southern railroad, cross Lincoln Avenue and Clinton Street before swinging northwest to connect to Pike Street at Fifth Street.

The road would be two-lanes, according to Cripe and would not have any other entrances or exits. She said the two-lane dedicated route would be enough to move U.S. 33 traffic efficiently.

Much of the roadway would be a bridge or elevated approaches to the bridge. The bridge would span three city streets, Ninth, Lincoln Avenue and Cottage Avenue. According to concept plans, the bridge would rise 34 feet at its highest point. Cripe said the approaches to the bridge would be earth-filled with straight walls.

Text Only
Local News
  • BIRTHS FOR JULY 28, 2014 IU HEALTH GOSHEN HOSPITALFridayShelli and Eric Eaton, Middlebury, a son, Oliver Marcus EatonAndrea and Tim McGraw, Elkhart, a daughter, Reagan Marie McGrawCandice and Austin Cors, Elkhart, a son, Caleb Austin CorsSaturdayTiffany and Justin Klase, Gos

    July 28, 2014

  • State's attempt to ward off dangers working July 1 each year marks the day in Indiana when new laws take effect. But rather than focus on new laws, let’s observe the anniversary of a law that went on the books three years ago this month — the law that barred texting while driving.Each year sin

    July 28, 2014

  • GN140728 demo derby 02 ELKHART COUNTY 4-H FAIR: Both cars and drivers are characters in the popular demolition derby Sugg hed: Inside the mind of demolition derby drivers By ROBBY HOWARD robby.howard@goshennews.com GOSHEN — At the annual Nationwide Demolition Derby, old battered cars take on a new life before their likely demise. None of the cars featured on the fi

    July 27, 2014 4 Photos

  • SLIDESHOW: Demolition Derby

    July 27, 2014

  • GN140726 postal retiree 02 Goshen mail carrier Gary Miller to deliver his last letter GOSHEN — Its been one amazing journey, but now it’s time to pass the torch on to the next generation.That’s the word from Gary Miller, a Goshen native who has spent the past 44 years serving as a postal carrier for the city. After more than four deca

    July 27, 2014 1 Photo

  • GN140727 end of fair feature 03 Cool weather, improvements lead to a banner year for Elkhart County 4-H Fair GOSHEN — The 2014 Elkhart County 4-H Fair might go down in history as one with solid attendance, record-breaking support in the livestock auction and mostly cool temperatures. But above all, it was a pivotal year for the annual event, fair president

    July 26, 2014 2 Photos

  • GN140726 fair vendor 01 FAIR FACES: There's no place like the fair for getting the word out GOSHEN — As one of the largest county fairs in the nation, one would be hard-pressed to find a location or event within Elkhart County that boasts the sheer amount of foot traffic that can be found at the Elkhart County 4-H Fair. But what does all th

    July 26, 2014 1 Photo

  • 4-H FAIR: Steer sale nets $15K-plus for Seed to Feed program GOSHEN — The shock on Lane Flowers’ face was obvious.

    July 26, 2014

  • NWS GN0725 clinton frame church 01 Clinton Frame eyes new conference after gay marriage split GOSHEN — There appears to be a schism forming within the heart of the Mennonite faith, and at epicenter of that schism is what some in the denomination perceive to be an increasing support for or affirmation of the controversial issue of same-sex marriage among certain Mennonite congregations.

    July 25, 2014 1 Photo

  • Shipshe Town Hall Council awards street improvement project contract

    The Shipshewana Town Council awarded a contract Thursday for the North Street Improvement Project to low bidder Rieth-Riley Construction Co. of South Bend for $125,152 and approved a notice to proceed with the project. 
    The South Bend company nudged out Niblock Excavating and ATI Construction, who were both within $1,328 of the winning bid.

    July 25, 2014 1 Photo

Parade
Magazine

Click HERE to read all your Parade favorites including Hollywood Wire, Celebrity interviews and photo galleries, Food recipes and cooking tips, Games and lots more.
Poll

With military action and tensions escalating between Russia and Ukraine, as well as Israel and Palestine, are you worried that the U.S. and other nations may get drawn into these conflicts?

Yes, it is a great concern of mine
I’m a little worried, but not too much
No, I’m not worried at all
     View Results
AP Video
Traditional African Dishes Teach Healthy Eating The Carbon Trap: US Exports Global Warming 13 Struck by Lightning on Calif. Beach Baseball Hall of Famers Inducted Israel, Hamas Trade Fire Despite Truce in Gaza Italy's Nibali Set to Win First Tour De France Raw: Shipwrecked Concordia Completes Last Voyage Raw: Sea Turtle Hatchlings Emerge From Nest Raw: Massive Dust Storm Covers Phoenix 12-hour Cease-fire in Gaza Fighting Begins Raw: Bolivian Dancers Attempt to Break Record Raw: Israel, Palestine Supporters Rally in US Raw: Air Algerie Flight 5017 Wreckage Virginia Governor Tours Tornado Aftermath Judge Faces Heat Over Offer to Help Migrant Kids Kangaroo Goes Missing in Oklahoma More M17 Bodies Return, Sanctions on Russia Grow Raw: Deadly Tornado Hits Virginia Campground Ohio State Marching Band Chief Fired After Probe Raw: Big Rig Stuck in Illinois Swamp